1.
3R-Restoration, Rehabilitation, and
Resurfacing
2.
4R-3R plus Reconstruction
3.
AAA-American Automobile Association
4.
AADL-Annual Average Daily Loading
5.
AAR-Association of American
Railroads
6.
AASHO-Formel Name of AASHTO
7.
AASHTO - American Association of
state highway Transport Official.
8.
AC - Asbestos cement.
9.
AC-Asphalt Concrete
10.
ACI - American concrete institute.
11.
ACPA-American Concrete Pavement
Association.
12.
ADL-Average Daily Load
13.
ADT-Average Daily Traffic
14.
ANSI-American National Standards Institute
15.
AREA - American Railway engineering
Association.
16.
ASC - Allowable Stress of concrete.
17.
ASCE-American Society of Civil
Engineers
18.
ASTM - American society for testing
materials.
19.
B.M - Bending moment.
20.
BM - Bench mark.
21.
C.I.Pipe - Cast iron pipe.
22.
C.I.Sheet - Corrugated Iron sheet.
23.
CC - Cement concrete.
24.
CERF-Civil Engineering Research
Foundation (ASCE)
25.
CERL-Construction Engineering
Research Laboratory (COE)
26.
CL-Car load
27.
CP - Cement plaster.
28.
CPM - Critical path method.
29.
CS - Comparative statement.
30.
D-Depth (slab thickness)
31.
DL - Dead load.
32.
DL-Driver Licensing
33.
DPC - Damp proof course.
34.
EAL-Equivalent Axle Load
35.
EGL - Existing ground level.
36.
EL - Environmental load.
37.
EWL-Equivalent Wheel Load
38.
FGL - Formation ground level.
39.
FM - Fineness modules.
40.
GIS-Geographic Information System
41.
GL - Ground level.
42.
GP - Ground plane.
43.
HFL - Highest flood level.
44.
Highway and Transportation
Officials.
45.
HM-Hazardous Materials
46.
HM-Hazardous Materials
47.
HP - Horizontal plane.
48.
I & M-Inspection and Maintenance
49.
I&M-Inspection and Maintenance
50.
IFME-International Federation of
Municipal Engineers
51.
IPWF-International Public Works
Federation
52.
ISI - Indian standard institute.
53.
ISO-International Standards
Organization
54.
KIP (S)-Kilo pound(s)
55.
KMPT-Kilo meter point
56.
KRA-Kingpin-to-rear axle
57.
LC - Lime concrete.
58.
LL - Live load.
59.
LT-Left Turn
60.
MB - Measurement book.
61.
ML-Mainline
62.
MMS-Maintenance Management System
63.
NCF - Neat cement finishing.
64.
OGL - Original ground level.
65.
P&R-Planning and Research
66.
PCA-Portland Cement Association.
67.
PCC – Plain Cement Concrete.
68.
PCI-Pavement Condition Index
69.
PC-Passenger Car
70.
PERT - Programmed Evaluation and
Review Technique.
71.
PL - Plinth level.
72.
PPR - Poly Propylene Random.
73.
PVC - Poly vinyl chlorides.
74.
Q-Traffic volume
75.
R&D-Research and Development
76.
R&R-Restoration and
Rehabilitation
77.
RBC - Reinforced Brick concrete.
78.
RBW - Reinforced brick work.
79.
RCC - Reinforced Cement Concrete.
80.
RL - Reduced level.
81.
SMS-Safety Management System
82.
SOW-Statement of Work
83.
SWG - Standard wire gauge.
84.
T/L-Traffic/Load
85.
TMA-Transportation Management Area
86.
UPVC - Unplasticized Poly vinyl
chlorides.
87.
USC - Ultimate stress of concrete.
88.
USD - Ultimate strength design.
89.
VP - Vertical plane.
90.
W.C - Water closet.
91.
WSD - Working stress design.
0 Comments
Please do not enter any spam links in the comment box