Basic Important Point for Civil/Site Engineer
Bellow
are some info & Standards that help for civil, Design, Site Engineers
1- Concrete Grade:
Concrete
Grade: |
Mix Ratio |
M5 or M50 |
1 : 4 : 8 |
M10 or M100 |
1 : 3 : 6 |
M15 or M 150 |
1 : 2 : 4 |
M20 or M200 |
1 : 1.5 : 3 |
M25 or 250 |
1 : 1 : 2 |
M30 or M300 |
1 : 0.75 :
1.5 |
2-
Concrete Grade
Mixture:
2.1. M5 or M50 (1:4:8):
M50 = 50 Mpa = 725 Psi
Cement = 141 Kgr
Water = 70.5 Liter
2.2. M10 or
M100 (1 : 3 : 6):
M50 = 50 Mpa = 1450 Psi
Cement = 226 Kgr
Water = 87 Lit
2.3. M15 or M
150 (1 : 2 : 4):
M50 = 50 Mpa = 2175
Psi
Cement = 320
Kgr
Sand = 717.8
Kgr
Water = 161 Liter
2.4. M20 or
M200 (1: 1.5: 3):
M20 = 200 Mpa = 2900 Psi
Cement = 403 Kg
Water: 201 Lit
Sand & Other = 672 Kgr
2.5. M25 or 250
(1 : 1 : 2):
M25 = 250 Mpa = 3625 Psi
Cement = 565 Kg = 7 Bigs
Water: 282 Kgr
Sand, Agg & Other: 565 Kgr
2.5. M30 or
M300 (1 : 0.75 : 1.5):
M30 = 300 Mpa
M30 = 4350 Psi
Cement = 452
Kgr
Water = 282 Lit
3-
Reinforcement
Concrete Cover:
Footing |
50 mm |
Raft
Foundation Top |
50 mm |
Raft Foundation
Bottom/ Sides |
50 - 75 mm |
Strap Beam |
50 mm |
Grade Slab |
20 mm |
Column |
40 mm |
Shear Wall |
25 mm |
Beams |
25 mm |
Slabs |
15 mm |
Flat Slab |
20 mm |
Staircase |
15 mm |
Retaining
Wall |
20 – 25 mm |
Water
Retaining Wall |
20 – 30 mm |
4-
Stripping Time
(De-Shuttering) of Reinforcement Concrete.
Vertical Form Work (Wall, Columns, etc.) |
1 – 2 Days |
Soffit Formwork to Slabs |
3 Days (Props to be refixed after removal) |
Soffit to beams props |
7 Days Props to refix after removal |
Spanning Up to 4.5 m |
7 Days |
Spanning Over 4.5 m |
14 Days |
Arches Spanning up to 6 m |
14 Days |
Arches Spanning Over 6 m |
21 Days |
5-
Weight of
Engineering Materials (Density of Some Construction Materials).
Bitumen |
1340 Kg/Cu M |
Cement |
1440 Kg/Cu M |
Stone |
2850 to 2960
Kg/Cu M |
Water |
1000 Kg/Cu M |
PCC |
2200 to 2250
Kg/Cu M |
RCC |
2420 Kg/Cu M
– for 2% steel |
Bricks |
1600 to 1920
Kg/Cu M |
Cast Iron |
7650 Kg/Cu M |
Steel |
7850 Kg/Cu M |
Ice |
913 Kg/Cu M |
Petrol |
690 Kg/Cu M |
6- Weight of Steel Bar Per Meter:
6 mm |
0.222 Kg/M |
8 mm |
0.395 Kg/M |
10 mm |
0.616 Kg/M |
12 mm |
0.888 Kg/M |
16 mm |
1.578 Kg/M |
20 mm |
2.466 Kg/M |
25 mm |
3.853 Kg/M |
Formula Weight
Per Meter = L.D2/162.
For Calculation follow this link How to find steel Bars weight per meter
7- Standard Conversion Factors:
1 Kilo Meter |
1000 Meter |
1 Kilo Meter |
0.62 Mile |
1 Meter |
100
Centimeter |
1 Meter |
3.28 Feet |
1 Meter |
1.093 Yard |
1 Meter |
1000 Millimeter |
1 Centimeter |
10 millimeters |
1 Centimeter |
0.393 Inch |
1 Inch |
2.54
Centimeter |
1 Foot |
0.305 Meter |
1 Yard |
0.913 Meter |
1 Comments
Nice Blog. Thanks for sharing with us. Such amazing information.
ReplyDeleteWhat is the best engineering institute for civil engineering in Uttarakhand?
Please do not enter any spam links in the comment box