Basic Important Point for Civil/Site Engineer

 Basic Important Point for Civil/Site Engineer


Bellow are some info & Standards that help for civil, Design, Site Engineers

1-     Concrete Grade:

Concrete Grade:

Mix Ratio

M5 or M50

1 : 4 : 8

M10 or M100

1 : 3 : 6

M15 or M 150

1 : 2 : 4

M20 or M200

1 : 1.5 : 3

M25 or 250

1 : 1 : 2

M30 or M300

1 : 0.75 : 1.5

 For the Calculation, the procedure follows bellow link Step 4: Step 3: Calculation of Cement, Sand, Aggregate in Concrete.

2-     Concrete Grade Mixture:

2.1. M5 or M50  (1:4:8):

M50 = 50 Mpa = 725 Psi

Cement = 141 Kgr

Water = 70.5 Liter

2.2. M10 or M100 (1 : 3 : 6):

M50 = 50 Mpa = 1450 Psi

Cement = 226 Kgr

Water = 87 Lit

2.3. M15 or M 150 (1 : 2 : 4):

M50 = 50 Mpa = 2175 Psi

Cement = 320 Kgr

Sand = 717.8 Kgr

Water = 161 Liter

2.4. M20 or M200 (1: 1.5: 3):

M20 = 200 Mpa = 2900 Psi

Cement = 403 Kg

Water: 201 Lit

Sand & Other = 672 Kgr

2.5. M25 or 250 (1 : 1 : 2):

M25 = 250 Mpa = 3625 Psi

Cement = 565 Kg = 7 Bigs

Water: 282 Kgr

Sand, Agg & Other: 565 Kgr

2.5. M30 or M300 (1 : 0.75 : 1.5):

M30 = 300 Mpa

M30 = 4350 Psi

Cement = 452 Kgr

Water = 282 Lit

3-     Reinforcement Concrete Cover:

Footing

50 mm

Raft Foundation Top

50 mm

Raft Foundation Bottom/ Sides

50 - 75 mm

Strap Beam

50 mm

Grade Slab

20 mm

Column

40 mm

Shear Wall

25 mm

Beams

25 mm

Slabs

15 mm

Flat Slab

20 mm

Staircase

15 mm

Retaining Wall

20 – 25 mm

Water Retaining Wall

20 – 30 mm



4-    
Stripping Time (De-Shuttering) of Reinforcement Concrete.

Vertical Form Work (Wall, Columns, etc.)

1 – 2 Days

Soffit Formwork to Slabs

3 Days (Props to be refixed after removal)

Soffit to beams props

7 Days Props to refix after removal

Spanning Up to 4.5 m

7 Days

Spanning Over 4.5 m

14 Days

Arches Spanning up to 6 m

14 Days

Arches Spanning Over 6 m

21 Days

 

5-     Weight of Engineering Materials (Density of Some Construction Materials).

Bitumen

1340 Kg/Cu M

Cement

1440 Kg/Cu M

Stone

2850 to 2960 Kg/Cu M

Water

1000 Kg/Cu M

PCC

2200 to 2250 Kg/Cu M

RCC

2420 Kg/Cu M – for 2% steel

Bricks

1600 to 1920 Kg/Cu M

Cast Iron

7650 Kg/Cu M

Steel

7850 Kg/Cu M

Ice

913 Kg/Cu M

Petrol

690 Kg/Cu M

 For more Materials follow this link: Density of Construction Materials:

6-     Weight of Steel Bar Per Meter:

6 mm

0.222 Kg/M

8 mm

0.395 Kg/M

10 mm

0.616 Kg/M

12 mm

0.888 Kg/M

16 mm

1.578 Kg/M

20 mm

2.466 Kg/M

25 mm

3.853 Kg/M


Formula Weight Per Meter = L.D2/162.

For Calculation follow this link How to find steel Bars weight per meter

7-     Standard Conversion Factors:

1 Kilo Meter

1000 Meter

1 Kilo Meter

0.62 Mile

1 Meter

100 Centimeter

1 Meter

3.28 Feet

1 Meter

1.093 Yard

1 Meter

1000 Millimeter

1 Centimeter

10 millimeters

1 Centimeter

0.393 Inch

1 Inch

2.54 Centimeter

1 Foot

0.305 Meter

1 Yard

0.913 Meter